Civil Construction
At Currie Construction, our Civil Division is led by Sam (Director) and Craig (Civil Contracts Manager), whose leadership has helped us grow into one of the region’s leading Tier 1 civil contractors. Our team combines experience, innovation, and attention to detail to deliver projects that strengthen communities and stand the test of time.
We work across a wide range of projects from essential infrastructure to landmark restorations with expertise in:
-
Bridge Works – construction, refurbishment, and abutment remedial works.
-
Drilling & Foundations – tieback anchors, weep holes, piling, and stabilisation solutions.
-
Roading – shoulder widening, kerb and channel, trenching, and asphalt repairs.
-
Concrete Services – pumping, drilling, cutting, and shotcreting.
-
Slip Remediation – repairing and stabilising slips and landslides.
-
Culvert Installations – effective drainage and stormwater management.
-
Retaining Walls – structural and architectural retaining solutions.
-
Public Landscaping – large-scale landscaping and civic space development.
-
Specialised Public Works – earthworks, drainage, structural concrete, and restoration of architectural features and monuments.
With every project, we bring technical excellence and a commitment to quality, delivering results that not only meet but exceed expectations.

Past Projects

Anchored Sheet Piling

Pedestrian Bridge

Drilling

Soil Nails/Shot crete

Demolition

Refurbishment

Viewing Platform

Anchoring/UC Retaining Wall

Deadman Wall

Sheet Piles, MSE Wall & Armour Rock

Floodgate Construction

Installation of Sheet Piles, Deadman Anchors & Concrete Capping Beam

16M Deep 750MM DIA Inground Palisade Wall

13.5m Long Timber Pole Retaining Wall

Two bridges constructed at 30 & 45m

Timber Pole Retaining Wall

Slip Stabilisation & Road Reinstatement

Tie Back Anchor, Shotcrete Wall Construction & Drainage Improvements

Demolition of Residential Properties

Emergency Culvert Replacement (Cyclone Gabriel)

Clean up

Soil Nails, Mesh & Shotcrete

400 metres of Stormwater upgrade

13 Scour Sites

Soil Nails, Inground Palisade Wall & Retreats

Retaining Wall, 11M UC Bored Pile with Two Rows of Tie Back Anchors

Upgrade Existing Skate Park












